Plate Machining Scope
Each catalog reference carries its selected scope into the quotation form. Finished dimensions, material records and acceptance follow the approved order.
Plate Machining Scope
Drawing-specific machining of the plate interfaces, bores, support and clearance features required by the selected hot runner layout.
- Supply scope
- Plate/feature machining
- Interface review
- Send the plate drawing together with the matching manifold/nozzle interface revision. Identify support, locating, clearance and access features to be machined. List plate material, delivery condition, quantities and the inspection points to be reported.
- Size scope
- Plate dimensions, material condition and machining access confirmed against the drawing; no universal plate tolerance is inferred.
Send the plate drawing together with the matching manifold/nozzle interface revision. Identify support, locating, clearance and access features to be machined. List plate material, delivery condition, quantities and the inspection points to be reported.
Request this optionPlate machining covers the drawing features listed in the quotation. Any supplied hardware, assembly or subsequent toolmaking operations are identified separately.
Drawing and Quotation Checklist
- Send the plate drawing together with the matching manifold/nozzle interface revision.
- Identify support, locating, clearance and access features to be machined.
- List plate material, delivery condition, quantities and the inspection points to be reported.
Include quantity, drawing revision, required inspection documents and delivery destination. Single-piece and small-batch inquiries are accepted.
Prepare a mold base inquiryInspection and Production Planning
Specify plate material, condition, finished features, datum references and the agreed dimensional/CMM report. Plate geometry, machining allowance and acceptance are confirmed for the drawing; overall mold-base limits do not define a universal plate tolerance.
Production schedule: Confirmed after drawing review. Working days exclude weekends and statutory public holidays in China. The clock starts on the next working day after formal PO receipt, final drawing/specification approval and applicable deposit receipt are all completed. Transport time is separate.



